
What exactly is a pre-demolition condition survey?
The terminology is not always consistent. Similar services are marketed as:
Package 1: Pre-Demolition Property Condition Survey
For properties adjacent to demolition or construction activity.
Includes:
Package 2: Pre-Construction / Excavation Condition Survey
For projects involving excavation, foundation work, trenching, heavy equipment, or other potentially disruptive activities.
Includes:
Package 3: Pre- and Post-Work Condition Survey
This is the premium offering.
Includes:
Contact us via text/call 1-603-369-4420, or Email info@structurechecknh.com.
Protect your project with professional photographic documentation of neighboring properties before demolition, excavation, blasting, or construction begins.
Structure Check LLC | New Hampshire & Southern Maine
Establish a baseline. Document existing conditions. Reduce uncertainty.
"We document the condition of neighboring properties before demolition, excavation, or construction begins. Our reports provide dated photographs and written descriptions of existing cracks, settlement, and other visible conditions, giving your company a baseline record before work starts."
Our reports include:
Protect your project with professional photographic documentation of neighboring properties before demolition, excavation, blasting, or construction begins.
Structure Check LLC | New Hampshire & Southern Maine
Establish a baseline. Document existing conditions. Reduce uncertainty.
"We document the condition of neighboring properties before demolition, excavation, or construction begins. Our reports provide dated photographs and written descriptions of existing cracks, settlement, and other visible conditions, giving your company a baseline record before work starts."
Our reports include:
Examples include:
Structure Check has done projects for:
Examples include:
Examples include:
Developers may benefit from surveys before construction begins, particularly when the project involves multiple neighboring properties.
New Hampshire has specific blasting inspection provisions, and local ordinances can impose additional requirements.
For example:
Mon | 09:00 am – 05:00 pm | |
Tue | 09:00 am – 05:00 pm | |
Wed | 09:00 am – 05:00 pm | |
Thu | 09:00 am – 05:00 pm | |
Fri | 09:00 am – 05:00 pm | |
Sat | 09:00 am – 12:00 pm | |
Sun | Closed |